Orlando International Airport – Check Point Charlie

Orlando, Florida

Project Overview

Rhodes+Brito were selected for the development of design and construction documents as the Architect of Record for the 1,344 SF single story building Checkpoint. CPC provides vehicular access to both the Orlando International Airport AOA area and secure access area to the main Terminal Complex & Airsides. There are Six (6) covered vehicular access lanes that will provide both digitally scanning via a Under Vehicular Camera system and manually scanning. The access roads are protected with M50 Security rated vehicular crash gates. It is be staffed with 6-8 TSA grade personal. All non-employee visitors are required to leave their vehicle, enter the building, and go through security screening equipment inside the building.

Owner
Greater Orlando Aviation Authority (GOAA)
Project Status
Completed in 2020
Role
Architect of Record
Cost
$1.5 Million
Project Size
$5,172,100 + 1,431 Gross Square Foot

View related projects

Award-winning Central Florida Design Firm

Together we can shape a better future.

© Copyright 2025 Rhodes+Brito Architects, Inc. All Rights Reserved.